I-696 Ramp WB over I-75 & Ramps To I-75 SB
Fair Condition55 years old17,000 vehicles/day
Location
| State | Michigan |
| County | Oakland |
| Location | I-75 / I-696 Intrchg |
| Carries | I-696 Ramp WB |
| Crosses | I-75 & Ramps To I-75 SB |
| Coordinates | 42.47608, -83.11194 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 315.9 ft (96.3 m) |
| Max Span | 137.1 ft (41.8 m) |
| Deck Width | 29.5 ft (9 m) |
| Deck Area | 866.7 sq m |
| Main Spans | 4 |
| Year Built | 1971 (reconstructed 2007) |
Traffic
| Avg Daily Traffic | 17,000 (1982) |
| Truck Traffic | 5% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000007980 |