County RD 702 over Powder R (chandler Ln)
Fair Condition73 years old158 vehicles/day
Location
| State | Oregon |
| County | Baker |
| Location | 0.7 Mi W Jct Co #737 |
| Carries | County RD 702 |
| Crosses | Powder R (chandler Ln) |
| Coordinates | 44.86184, -117.83380 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 3 — Scour critical |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 65.9 ft (20.1 m) |
| Max Span | 63.0 ft (19.2 m) |
| Deck Width | 34.1 ft (10.4 m) |
| Deck Area | 209.0 sq m |
| Main Spans | 1 |
| Year Built | 1953 (reconstructed 1976) |
Traffic
| Avg Daily Traffic | 158 (2020) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 07759A702 00072 |