N Burgard ST over B-1 Over Up/sprr
Poor Condition96 years old13,113 vehicles/day
Location
| State | Oregon |
| County | Multnomah |
| Location | At Terminal No 4 |
| Carries | N Burgard ST |
| Crosses | B-1 Over Up/sprr |
| Coordinates | 45.60643, -122.76628 |
Condition Ratings
| Overall Condition | Poor |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 3 (Serious) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 126.0 ft (38.4 m) |
| Max Span | 21.0 ft (6.4 m) |
| Deck Width | 48.6 ft (14.8 m) |
| Deck Area | 568.3 sq m |
| Main Spans | 6 |
| Year Built | 1930 (reconstructed 1988) |
Traffic
| Avg Daily Traffic | 13,113 (2020) |
| Truck Traffic | 22% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 12 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 25B01 000 00136 |