2nd Street over Warm Creek
Good Condition4 years old8,055 vehicles/day
Location
| State | California |
| County | San Bernardino |
| Location | 300 Ft E/o Arrowhead AVE |
| Carries | 2nd Street |
| Crosses | Warm Creek |
| Coordinates | 34.10281, -117.28853 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 56.1 ft (17.1 m) |
| Max Span | 51.2 ft (15.6 m) |
| Deck Width | 82.0 ft (25 m) |
| Deck Area | 427.5 sq m |
| Main Spans | 1 |
| Year Built | 2022 |
Traffic
| Avg Daily Traffic | 8,055 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 54C0803 |