Chenango DR over Tollgate Creek
Fair Condition32 years old10,350 vehicles/day
Location
| State | Colorado |
| County | Arapahoe |
| Location | Just E Of Himalaya Ct |
| Carries | Chenango DR |
| Crosses | Tollgate Creek |
| Coordinates | 39.62649, -104.75204 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 20.7 ft (6.3 m) |
| Max Span | 9.8 ft (3 m) |
| Deck Width | 111.9 ft (34.1 m) |
| Deck Area | 214.8 sq m |
| Main Spans | 2 |
| Year Built | 1994 |
Traffic
| Avg Daily Traffic | 10,350 (2021) |
| Truck Traffic | 2% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | CENT 34-16.1 |