Level 6 NW Termina over Terrain
Fair Condition33 years old8,004 vehicles/day
Location
| State | Colorado |
| County | Denver |
| Location | NW Corner Term Bldg |
| Carries | Level 6 NW Termina |
| Crosses | Terrain |
| Coordinates | 39.85053, -104.67500 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 495.7 ft (151.1 m) |
| Max Span | 55.4 ft (16.9 m) |
| Deck Width | 39.4 ft (12 m) |
| Deck Area | 1813.2 sq m |
| Main Spans | 8 |
| Year Built | 1993 |
Traffic
| Avg Daily Traffic | 8,004 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | Other Local Agencies |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | D-31-PB-832 |