SH 9 Ml over Pedestrian Underpass
Good Condition3 years old22,287 vehicles/day
Location
| State | Colorado |
| County | Summit |
| Location | 200 Ft S Of Peak One BLVD |
| Carries | SH 9 Ml |
| Crosses | Pedestrian Underpass |
| Coordinates | 39.57253, -106.07929 |
Condition Ratings
| Overall Condition | Good |
| Superstructure | 9 (Excellent) |
| Substructure | 9 (Excellent) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Aluminum/Wrought Iron/Cast Iron |
| Design | Frame |
| Total Length | 24.6 ft (7.5 m) |
| Max Span | 24.6 ft (7.5 m) |
| Deck Width | 108.9 ft (33.2 m) |
| Deck Area | 249 sq m |
| Main Spans | 1 |
| Year Built | 2023 |
Traffic
| Avg Daily Traffic | 22,287 (2023) |
| Truck Traffic | 4% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | F-12-AE |