Stage Gulch Road over Dry Gully
Fair Condition35 years old162 vehicles/day
Location
| State | Oregon |
| County | Umatilla |
| Location | 6.5 Mi E Of S Edwards RD |
| Carries | Stage Gulch Road |
| Crosses | Dry Gully |
| Coordinates | 45.77525, -119.07688 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 3 — Scour critical |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Channel Beam |
| Total Length | 40.0 ft (12.2 m) |
| Max Span | 39.0 ft (11.9 m) |
| Deck Width | 27.9 ft (8.5 m) |
| Deck Area | 103.7 sq m |
| Main Spans | 1 |
| Year Built | 1991 |
Traffic
| Avg Daily Traffic | 162 (2020) |
| Truck Traffic | 20% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 59C537110000452 |