I-75 SB To 869 NB over I-75 Connctrs &new River

Fair Condition37 years old7,500 vehicles/day

Location

StateFlorida
CountyBroward
LocationI-75 & I-595 Interchange
CarriesI-75 SB To 869 NB
CrossesI-75 Connctrs &new River
Coordinates26.12056, -80.34747

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Scour Critical9 — Foundation above flood level

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignSegmental Box Girder
Total Length3939.0 ft (1200.6 m)
Max Span206.0 ft (62.8 m)
Deck Width42.7 ft (13 m)
Deck Area15607.8 sq m
Main Spans24
Year Built1989

Traffic

Avg Daily Traffic7,500 (2024)
Truck Traffic6%
Lanes On Bridge2
Lanes Under Bridge17

Inspection & Ownership

Last Inspection224
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number860512

Nearby Bridges