SB 869 To SB I-75 over WB Sr-84 & N. New River
Fair Condition38 years old27,500 vehicles/day
Location
| State | Florida |
| County | Broward |
| Location | I-595 / I-75 Interchange |
| Carries | SB 869 To SB I-75 |
| Crosses | WB Sr-84 & N. New River |
| Coordinates | 26.12275, -80.34514 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Segmental Box Girder |
| Total Length | 388.1 ft (118.3 m) |
| Max Span | 140.1 ft (42.7 m) |
| Deck Width | 58.7 ft (17.9 m) |
| Deck Area | 2117.6 sq m |
| Main Spans | 4 |
| Year Built | 1988 |
Traffic
| Avg Daily Traffic | 27,500 (2023) |
| Truck Traffic | 6% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 860517 |