Sb-869 To EB I-595 over I-75 Cnctrs & New River
Fair Condition37 years old12,000 vehicles/day
Location
| State | Florida |
| County | Broward |
| Location | I-75 & I-595 Interchange |
| Carries | Sb-869 To EB I-595 |
| Crosses | I-75 Cnctrs & New River |
| Coordinates | 26.12086, -80.34499 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Segmental Box Girder |
| Total Length | 3112.9 ft (948.8 m) |
| Max Span | 195.2 ft (59.5 m) |
| Deck Width | 42.7 ft (13 m) |
| Deck Area | 12334.4 sq m |
| Main Spans | 19 |
| Year Built | 1989 |
Traffic
| Avg Daily Traffic | 12,000 (2024) |
| Truck Traffic | 6% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 19 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 860511 |