Sma8513;id Cntr RD over Phyllis Canal

Fair Condition39 years old26,000 vehicles/day

Location

StateIdaho
CountyCanyon
Location2.5 N. 2.4 E. Nampa
CarriesSma8513;id Cntr RD
CrossesPhyllis Canal
Coordinates43.61508, -116.51317

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical4 — Foundations need monitoring

Physical Characteristics

MaterialConcrete
DesignFrame
Total Length26.9 ft (8.2 m)
Max Span26.9 ft (8.2 m)
Deck Width100.7 ft (30.7 m)
Deck Area251.7 sq m
Main Spans1
Year Built1987 (reconstructed 2005)

Traffic

Avg Daily Traffic26,000 (2023)
Truck Traffic2%
Lanes On Bridge5

Inspection & Ownership

Last Inspection223
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number000000000026945

Nearby Bridges