US 30 (hwy 067) over Uprr (eastgate)
Good Condition24 years old9,377 vehicles/day
Location
| State | Oregon |
| County | Umatilla |
| Location | 00.6 Mi NW Jct Fai-84 |
| Carries | US 30 (hwy 067) |
| Crosses | Uprr (eastgate) |
| Coordinates | 45.67343, -118.77462 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 737.9 ft (224.9 m) |
| Max Span | 91.9 ft (28 m) |
| Deck Width | 65.6 ft (20 m) |
| Deck Area | 4,498 sq m |
| Main Spans | 8 |
| Year Built | 2002 |
Traffic
| Avg Daily Traffic | 9,377 (2022) |
| Truck Traffic | 19% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 18661 067 00406 |