WB 595 To NB Sr869 over WB Sr84 & New River Cnl
Fair Condition38 years old11,000 vehicles/day
Location
| State | Florida |
| County | Broward |
| Location | I-75/SR869/I-595 Interchg |
| Carries | WB 595 To NB Sr869 |
| Crosses | WB Sr84 & New River Cnl |
| Coordinates | 26.12213, -80.34292 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Segmental Box Girder |
| Total Length | 499.0 ft (152.1 m) |
| Max Span | 182.1 ft (55.5 m) |
| Deck Width | 42.7 ft (13 m) |
| Deck Area | 1977.3 sq m |
| Main Spans | 4 |
| Year Built | 1988 |
Traffic
| Avg Daily Traffic | 11,000 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 860510 |