County Road 15 over Rocky Ford Canal

Fair Condition53 years old5 vehicles/day

Location

StateColorado
CountyOtero
Location.9 Mi N Of SH 50
CarriesCounty Road 15
CrossesRocky Ford Canal
Coordinates38.09886, -103.80261

Condition Ratings

Overall ConditionFair
Deck8 (Very Good)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length25.6 ft (7.8 m)
Max Span22.3 ft (6.8 m)
Deck Width20.7 ft (6.3 m)
Deck Area49.1 sq m
Main Spans1
Year Built1973

Traffic

Avg Daily Traffic5 (2022)
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberOT-15-14-31-050

Nearby Bridges