N215-w210 Connectr over I215 Sr210 Cajon Bl Bnsf
Good Condition14 years old1,001 vehicles/day
Location
| State | California |
| County | San Bernardino |
| Location | 08-sbd-215-10.00-sbd |
| Carries | N215-w210 Connectr |
| Crosses | I215 Sr210 Cajon Bl Bnsf |
| Coordinates | 34.14269, -117.31752 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 2055.8 ft (626.6 m) |
| Max Span | 180.4 ft (55 m) |
| Deck Width | 41.3 ft (12.6 m) |
| Deck Area | 7895.2 sq m |
| Main Spans | 13 |
| Year Built | 2012 |
Traffic
| Avg Daily Traffic | 1,001 (2020) |
| Truck Traffic | 3% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 19 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 54 1234G |