Sr-417 NB over Dowden Road

Fair Condition34 years old32,500 vehicles/day

Location

StateFlorida
CountyOrange
LocationSr417 Nb-dowden Road
CarriesSr-417 NB
CrossesDowden Road
Coordinates28.42783, -81.22813

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length142.4 ft (43.4 m)
Max Span140.4 ft (42.8 m)
Deck Width159.1 ft (48.5 m)
Deck Area2104.9 sq m
Main Spans1
Year Built1992 (reconstructed 2023)

Traffic

Avg Daily Traffic32,500 (2022)
Truck Traffic7%
Lanes On Bridge8
Lanes Under Bridge4

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerState Toll Authority
Historical SignificanceBridge is not eligible for the National Register
Structure Number750464

Nearby Bridges